Skip to content
  • QUOTE
  • 888.653.333
  • [email protected]
  • Products
    • Fire Protective Glass Tested to NFPA 252/257, UL 9/10C, ULC S104/S106; Blocks smoke and flames.
    • SuperLite® I
    • SuperClear® 45-HS
    • SuperClear® 45-HS-LI
    • SuperLite® I-XL
    • SuperLite® I-XL IGU
    • SuperLite® X-45/60/90
    • SuperLite® II-XL 45
    • Ceramics
    • Fire Resistive Glass Tested to ASTM E119 / UL 263 / ULC S101; Blocks smoke, flames and radiant heat.
    • SuperLite® II-XL 60
    • SuperLite® II-XL 90
    • SuperLite® II-XL 120
    • SuperLite® II-XLB 60
    • SuperLite® II-XLB 120
    • SuperLite® II-XLM 60
    • SuperLite® II-XLM 120
    • SuperSecure® II-XLS 45-120
    • Fire Rated Walls 60-120 minute fire resistive glass and frame assemblies tested to ASTM E119 / UL 263 / ULC S101.
    • GPX® Architectural Series Fire Resistive
    • GPX® Curtain Wall
    • GPX® Hurricane
    • GPX® Ballistic
    • GPX® Blast System
    • GPX® EZ Frame
    • Fire Rated Doors Full vision 20-45 minute fire protective doors and 60-90 minute temperature rise doors tested to NFPA 252 / UL 10C / ULC S104.
    • GPX® Architectural Series Fire Protective
    • GPX® Architectural Series Fire Resistive
    • GPX® Builders Series Fire Protective
    • GPX® Builders Series Temperature Rise
    • GPX® Hurricane
    • GPX® Ballistic
    • GPX® Vision Kit
    • Fire Rated Openings 20-45 minute fire protective glass and framing assemblies tested to NFPA 257 / UL 9 / ULC S106.
    • GPX® Architectural Series Fire Protective
    • GPX® Builders Series Fire Protective
    • GPX® EZ Frame
    • Fire Rated Floors 60-120 minute fire resistive glass floor assemblies tested to ASTM E119 / UL 263 / ULC S101.
    • GPX® FireFloor
    • Fire Rated Fences 20-60 minute fire rated glass fence for WUI areas or designated fire zones.
    • SAFTI FENCE
  • Literature
  • Specs
  • Details
  • Learn
    About Us
    Videos
    Case Studies
    Articles
    Blogs
    Continuing Education
    Literature
    BIM Library
    Industry Links
    Press Releases
    Testimonials
    Technical Bulletins
    Newsletters
    Product Selector
  • Gallery
  • Reps
  • Contact
  • Products
    • Applications
    • Fire Protective Glass
    • Fire Rated Doors
    • Fire Rated Fences
    • Fire Resistive Glass
    • Fire Rated Floors
    • Fire Rated Openings
    • Fire Rated Walls
    • W-30
  • Literature
  • Specs
  • Details
  • Learn
    • About Us
    • Product Selector
    • Articles
    • Blogs
    • BIM Library
    • Case Studies
    • Newsletters
    • Press Releases
    • Continuing Education
    • Technical Bulletins
    • Testimonials
    • Industry Links
    • Videos
  • Gallery
  • Reps
  • Contact
Menu
  • Products
    • Applications
    • Fire Protective Glass
    • Fire Rated Doors
    • Fire Rated Fences
    • Fire Resistive Glass
    • Fire Rated Floors
    • Fire Rated Openings
    • Fire Rated Walls
    • W-30
  • Literature
  • Specs
  • Details
  • Learn
    • About Us
    • Product Selector
    • Articles
    • Blogs
    • BIM Library
    • Case Studies
    • Newsletters
    • Press Releases
    • Continuing Education
    • Technical Bulletins
    • Testimonials
    • Industry Links
    • Videos
  • Gallery
  • Reps
  • Contact

Newsletters

Code Change Drives Industry Demand for 60-90 Minute Full-Vision Temperature Rise Doors (December 2019)

WATCH FULL VIDEO HERE

In the last couple of months, SAFTI FIRST has embarked on an ambitious, $8M expansion to upgrade our fire rated glass, systems, and door manufacturing capabilities in Merced, CA.  This includes the addition of two new structures, a bigger door facility that houses state-of-the-art automated equipment, and increasing SAFTI FIRST®’s SuperLite production facilities.

With architects specifying full-vision, code-compliant, 60 and 90 minute, temperature rise doors for exit stairwells and other code required applications, we found this as an opportunity to expand our Titan Metal Products (a division of SAFTI FIRST®) built GPX Builders Series Doors. With SAFTI FIRST®/Titan having tested and listed door sizes up to 10 ft. in height with multiple finishes including painted, aluminum-clad (our most popular), and stainless steel clad, combined with having the most flexible hardware options including concealed vertical rods, card readers, etc., we see this as a great opportunity to provide the fastest turnaround times for this rising demand for code-approved, full-vision, 60 and 90 minutes rated temperature rise doors.

To accomplish this goal of fast turnaround and meeting the demand for full-lite glass doors with all our fire glass options while maintaining our high product quality and fast lead times, we have added a new 17,000 sq. ft. building to our existing 50,000 sq. ft. door fabrication facility.  We’ve also added automated seam welders, automated door sanders, new paint booths, and additional door hanging bucks to ensure that each door that we fabricate functions as it should in the field before we send them out to the job site.

We have also started construction on our glass fabrication facility to double its size to 130,000 sq. ft. by adding a new 45,000 sq. ft. building to our existing fire rated glass manufacturing facility.  The demand for the new SAFTI FIRST® SuperClear 45-HS and SuperClear 45-HS-LI products as well as increased glass sizes for our 60-120-minute fire resistive SuperLite II-XL and SuperLite II-XLB products have dictated that we “raise the roof” to accommodate this growth.  I will elaborate some more on these updates – which includes new product development and testing – in my next blog.  Stay tuned!

These investments are being made to increase our production capacity while maintaining safe working conditions which we are very proud of. We are also proud to be the only USA-owned and based, fully vertically integrated, single-source fire rated glass and framing manufacturer here in the USA.  This is what distinguishes us from other fire rated glass and framing suppliers that import their products from overseas.  When you specify or purchase a fire rated glass and framing assembly from SAFTI FIRST® – whether its a window, door, storefront, curtain wall or floor product, you can be assured that it is made in SAFTI FIRST®’s facilities here in the USA.

It is amazing to think that when we first moved our manufacturing facility to Merced, CA in 2002, we started out with just one manufacturing facility that housed fire rated glass, fire rated framing and O’Keeffe’s Inc. manufacturing under one roof.  Fast-forward to 20 years later, and we now have 5 facilities and 300 employees.  I attribute much of this growth to the architects who have embraced advanced, USA-made, fire rated glass systems in their designs, and continue to push the limits of what fire rated glass systems can do. So many thanks to the architectural community for being our valued partner over the years, and we look forward to all the innovations and growth that lie ahead!

Share:
PrevPrevious NewsletterFire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall (September 2019)
Next NewsletterThis Too Shall Pass: Helpful Resources from SAFTI FIRST (March 2020)Next

Engineering. Design. Code.

Whether you’re looking for fire-rated walls, doors, openings, floors or a specialty service, we have the solution for you. With over 40 years of experience in testing, innovating, and providing technologically advanced fire-rated glass and framing products, we deliver unyielding performance and quality at a competitive price.

Let's Talk!

  • 888.653.3333
    (English)
  • 888.653.3333 ext. 652
    (Spanish)
  • [email protected]
  • Representative Map
Address
Corporate
100 N Hill Dr, Ste12, Brisbane, CA 94005
Factory
220 S R Street, Merced, CA 95341
Contact
Phone
888.653.3333 - English
888.653.3333 ext. 652 - Spanish
Fax
888.653.4444
Email
[email protected]

Sign up for our Newsletter!

Get notified of industry updates and new product alerts.

© [year] SAFTI FIRST. All rights reserved.​
Disclaimer & Privacy Policy | Cookie Policy
Instagram Twitter Linkedin Facebook Youtube Vimeo
Suggested Pages
Case Studies
Videos Archive
Request a Quote
SuperClear® 45-HS-LI
Continuing Education
Request a Quote
Continuing Education
Videos
SuperClear® 45-HS-LI
Case Studies